392

Tech West House
Ealing, London


Project Description

This permitted development converts a brick warehouse and office building into 58 flats and duplexes for private sale and rent. The buildings have been upgraded to meet Part L of the Building Regulations, all the windows have been replaced with metal-framed windows and, wherever possible, beams and trusses have been left exposed in keeping with the industrial aesthetic. A large portion of the warehouse roof has been removed to create an open courtyard at the centre allowing dual aspect flats with improved daylighting and circulation with a flat portion of roof converted into a green roof with flats overlooking it.

Client – Pinehill Capital
Structural Engineer – CSC
M&E – Acumen Technical
Other Consultants – NRG (energy assessment), Fusion (fire engineering).
Contractor – Formation Construction
Status – Completed January 2017
Number of residential units – 58
Gross internal floor area – 3,700sqm
Construction cost – £6m
Photography: Agnese Sanvito
Tech West House context image
Tech West House 01
Tech West House 02
Tech West House 03
Tech West House 04
Tech West House 05
Tech West House 06