Project facts and team
- Client: London Borough of Redbridge
- Status: Completed October 2014
- Gross internal floor area: 8,500 sqm
- Sustainability: BREEAM excellent
- Construction cost: £18.2m
- Structural Engineer: Ramboll UK
- Services Engineer: Ramboll UK
- Contractor: Bouygues UK
- CLT Supplier: KLH
- Photography: Hufton & Crow
Awards
- 2014 London Design Awards Gold Winner
- 2015 Constructing Excellence Awards (London & SE) Winner
- 2016 New London Architecture Awards Shortlisted
Project summary
Mayfield delivers the school’s educational needs and their ambition to create a “culture of aspiration”. It provides uplifting and flexible teaching spaces and a new social “heart” around a Hellerup stair in addition to extensive sports facilities and a dance studio that bring new opportunities for students and the local community.
With just 17 months available for design and delivery and a reduced EFA budget, a standardised solution seemed the only option. However by embracing digital design and off-site construction from the outset, we created a bespoke design and provided urgently needed school places in one of London’s most under pressure Boroughs.
Model 261
Key data
Current View: External
Drag the model to animate